After-treatment tunnel

For Stelrad/Henrad Radiator Group, HAAN Industrial Group developed and realised (turnkey) a new aftertreatment tunnel. In the post-treatment tunnel, the excess corrosion-resistant primer is rinsed off the radiators with UF (Ultra-Filtration) water, after which the radiators are dried. The designed post-treatment tunnel contributes to a more efficient and more circular production process. see our youtube channel for a complete view of the tunnel.

Details of project shown:
- complete design & engineering;
- fabrication;
- dismantling old tunnel;
- assembly and commissioning of new tunnel on site;
- fully stainless steel construction (30m x 2.5 x 5m)
- equipped with pumps and sprinkler system and cascade system for collection and reuse of UF water;
- equipped with conveyor system for radiators.

MAINTENANCE

HAAN Industrial Maintenance unburdens through optimal maintenance of technical installations, machines and related structures.

PROJECTS

HAAN Industrial Projects is the technical specialist for turn-key projects. One party for your (technical) projects.

people

HAAN Industrial People provides skilled technical personnel as an extension of your organisation. From one technical specialist to a complete team.

Working at haan? View the current vacancies